SWD in Auto-Track

DC3 Mirador Chemical Injection Controller Optimizes SWD Treatment

Saltwater disposal facilities are dynamic and require constant monitoring to maintain cost-efficient operations.

Chemical program performance suffers due to a consistent cycle of over and under treatment. These changes can happen throughout the day and impact water quality.

DC3 was called to conduct an on-site evaluation of the chemical program, injection equipment and field connectivity technology to provide a total chemical automation solution.

Our Mirador was installed and ran in Auto-Volume mode to obtain a baseline and demonstrate consistent rate control.

Auto-Track was enabled after the SCADA integration to adjust chemical injection rates to facility flow rates in real time. The Mirador delivered verifiable variance elimination and an optimized program.

Calculate Your ROI

Typical return on investment is seen anywhere from 3 days to 3 months