Case Studies

Advanced Adoption


After a successful 15-Unit pilot, the company elected to perform a fast-paced 120-unit rollout within 1 week on all wells within an operating area.

Scope was to expand chemical automation to all capstring wells in the operating area to achieve:

  • Real-time dosing based on current flowrates
  • Real-time tank volume tracking
  • All wireless installs, no trenching necessary